IJRET
  • CrossRef
  • Google Scholar
  • ischolar
  • Index Copernicus
  • IJRET
  • Alternate Text
  • IJRET
  • IJRET
  • IJRET
  • Alternate Text
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
Authors will receive one hard copy of full paper, individual print certificates and digital certificates, Submit Manuscript

CALL FOR PAPERS : DEC-2018

Submission Last Date :  30-Dec-2018
Acceptance Notification :  in 15 days
Publication Date :  in 5 days
Submit Manuscript Online

FOR AUTHORS

FOR REVIEWERS

IJRET® PUBLICATIONS

DOWNLOADS

CONTACT US

NEWS & UPDATES

Call for Paper Vol-7 Iss-02 Feb-2018

IJRET invites papers from various engineering disciplines for Volume-07 Issue-02, Feb-2018.

Submit Manuscript

Published Vol-07 Iss-01 Jan-18

IJRET Volume-07 Issue-01, Jan-2018 is published now.

Browse Papers

DEVELOPMENT OF THE PERFORMANCE BY IMPLEMENTATION AND INTEGRATION OF NEW TECHNIQUES

Mahmoud Mohamed A. Sayed, Mohamed Mokbel Elshafey

Abstract: This work aims to develop the performance and decrease the waste. It uses analytical tool (Root Cause - Analysis) which identify the barriers to know the root causes of it. Lean manufacturing, Total Productive Maintenance (TPM), 5S, and Lean Six-Sigma (LSS) represent as the techniques which using to develop performance, and decrease lead time, and waste. The methodology of this work depends on the integration among lean manufacturing, TPM, 5S, and LSS. Successful implementations of techniques start with training of all members to increase the opportunities for development. Indicators of successful implementation rely on production leveling before and after applying of new concepts. A key element of production leveling is the manpower responsible that placing orders to avoid undisciplined behavior, so it’s easy to allocate the necessary manpower and machine. The results indicate the impact of techniques on elements (resources) in working areas (Manpower, Machine, Method, Raw material, and environmental condition)

Keywords: Lean manufacturing, Total Productive Maintenance (TPM), Overall Equipment Effectiveness (OEE), 5S, and Lean Six-Sigma (LSS).

DOI: https://doi.org/10.15623/ijret.2018.0707024

Home | Publication Ethics | Privacy Policy | Terms & Conditions | Refund Policy | Feedback | Contact Us
Copyright © 2012-2018 IJRET Journal All rights reserved