CALL FOR PAPERS :
DEC-2018
| Submission Last Date |
:
|
30-Dec-2018
|
| Acceptance Notification
|
:
|
in 15 days
|
| Publication Date
|
:
|
in 5 days
|
FOR AUTHORS
FOR REVIEWERS
IJRET® PUBLICATIONS
DOWNLOADS
CONTACT US
NEWS & UPDATES
|
MODIFICATION IN BRAKE LINER PROCESSING TO ENHANCE PRODUCTIVITY
Mahaveer Jaiswal, Heramb Karlekar, Abhijeet Gade, Vinit Narvekar, Mahesh Kale
Abstract: Brake liners are composed of relatively soft but tough and heat resistance material with a high coefficient of dynamic friction typically mounted on a solid metal backing using high temperature adhesives or rivets. Before using brake liner in assembly it is needed to get finished the excess material on liner plate. Industry named “PETHE BRAKE MOTORS PRIVATE LIMITED”, uses two tools to finish excess material(asbestos lining) from 2 sides of liner plate which requires double tool setting time and results in increased process time. Here, in this project we are going to modify the tool in such a way that, excess time required for resetting of tool will be reduced and production rate will be increased without disturbing any other process parameter
Keywords: Liner plate, asbestos lining, finishing tool, process time
DOI: https://doi.org/10.15623/ijret.2017.0604007
|
|