IJRET
  • CrossRef
  • Google Scholar
  • ischolar
  • Index Copernicus
  • IJRET
  • Alternate Text
  • IJRET
  • IJRET
  • IJRET
  • Alternate Text
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
Authors will receive one hard copy of full paper, individual print certificates and digital certificates, Submit Manuscript

CALL FOR PAPERS : DEC-2018

Submission Last Date :  30-Dec-2018
Acceptance Notification :  in 15 days
Publication Date :  in 5 days
Submit Manuscript Online

FOR AUTHORS

FOR REVIEWERS

IJRET® PUBLICATIONS

DOWNLOADS

CONTACT US

NEWS & UPDATES

Call for Paper Vol-7 Iss-02 Feb-2018

IJRET invites papers from various engineering disciplines for Volume-07 Issue-02, Feb-2018.

Submit Manuscript

Published Vol-07 Iss-01 Jan-18

IJRET Volume-07 Issue-01, Jan-2018 is published now.

Browse Papers

SELECTION PROCESS FOR THE TENDER WINNER OF STORAGE TANK CONSTRUCTION BASED ON AHP IN MARKETING OPERATION REGION V PERTAMINA

Gadri Bachmid, Udisubakti Ciptomulyono, Endah Angreni

Abstract: Evaluation on the selection of winning contractors of tenders requires an assessment of the process as the most important element. That is because there are so many criteria taken into account by their clients. One of the contractors’ service clients in Indonesia is the Technical Services Region V Pertamina who is responsible for any undertakings of investment projects in the area of East Java, Bali and Nusa Tenggara. However, the potential problems occur frequently are construction failure and belated project which is underway for years past the expected time of construction work. The construction phase is a direct indication of the contractor selection process. Poor construction phase cannot be separated from the under privilege tendering process. As a result of the bad contractor selection process, the projects are undertaken by the unqualified and inexperienced contractors. This research is expected to provide solutions to optimize the cost and quality of contractors. Design of this research is descriptive, with the case study method. The approach taken is a mixed research (mix methodology) that combines qualitative and quantitative approaches. The data in this study were collected through questionnaires. Method of data analysis used in this study uses Analytical Hierarchy Process (AHP). Results revealed that the method can be used for predicting overall relative strength of each candidate. This application can also be developed to the wider scope of work and qualification of contractors.

Keywords: Tender, Storage Tank Construction, Analytical Hierarchy Process (AHP)

DOI: https://doi.org/10.15623/ijret.2016.0511031

Home | Publication Ethics | Privacy Policy | Terms & Conditions | Refund Policy | Feedback | Contact Us
Copyright © 2012-2018 IJRET Journal All rights reserved