IJRET
  • CrossRef
  • Google Scholar
  • ischolar
  • Index Copernicus
  • IJRET
  • Alternate Text
  • IJRET
  • IJRET
  • IJRET
  • Alternate Text
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
Authors will receive one hard copy of full paper, individual print certificates and digital certificates, Submit Manuscript

CALL FOR PAPERS : DEC-2018

Submission Last Date :  30-Dec-2018
Acceptance Notification :  in 15 days
Publication Date :  in 5 days
Submit Manuscript Online

FOR AUTHORS

FOR REVIEWERS

IJRET® PUBLICATIONS

DOWNLOADS

CONTACT US

NEWS & UPDATES

Call for Paper Vol-7 Iss-02 Feb-2018

IJRET invites papers from various engineering disciplines for Volume-07 Issue-02, Feb-2018.

Submit Manuscript

Published Vol-07 Iss-01 Jan-18

IJRET Volume-07 Issue-01, Jan-2018 is published now.

Browse Papers

URBAN RENEWAL CHALLENGES: A PERSPECTIVE ON REVITALISING “JANATA BAZAAR”

Nishanth.A.Patil

Abstract: It has been decades since Hubli’s Janata Bazaar has witnessed renewal of any kind. The condition of the bazaar is alarming to say the least. In such a back drop we would like to put forth a proposal for a multi-modal infrastructure consisting of a stadia arrangement to house the resident vendors, a separate commercial hub for the resident traders and a shopping complex consisting of a G+4 structure with 2 levels of sub-surface dedicated parking arrangements all on the above mentioned premises. Throughout the proposal, utmost care has been taken to optimize the design of the structure by incorporating fusion of flat-slabs, lift slabs, cantilever overhangs, fibre-glass reinforced concrete wall systems. Pre-stressing is incorporated to enhance efficiency of long spans and irregular slab panels. The structure is again subdivided into 2-way slab sections to cater to masonry strip loads and rolling loads of the transport vehicle. Surprisingly enough, the capacity has been increased by 15% in the dedicated vendor space. We would like to suggest a PPP (Public-Private partnership) model to develop the premises, the Mall in particular and liaise with the district administration, and put forth our solution to the problem.

Keywords: stadia; hub; mall; PPP; flatslabs; pre-stressing; capacity

DOI: https://doi.org/10.15623/ijret.2016.0506076

Home | Publication Ethics | Privacy Policy | Terms & Conditions | Refund Policy | Feedback | Contact Us
Copyright © 2012-2018 IJRET Journal All rights reserved