IJRET
  • CrossRef
  • Google Scholar
  • ischolar
  • Index Copernicus
  • IJRET
  • Alternate Text
  • IJRET
  • IJRET
  • IJRET
  • Alternate Text
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
Authors will receive one hard copy of full paper, individual print certificates and digital certificates, Submit Manuscript

CALL FOR PAPERS : DEC-2018

Submission Last Date :  30-Dec-2018
Acceptance Notification :  in 15 days
Publication Date :  in 5 days
Submit Manuscript Online

FOR AUTHORS

FOR REVIEWERS

IJRET® PUBLICATIONS

DOWNLOADS

CONTACT US

NEWS & UPDATES

Call for Paper Vol-7 Iss-02 Feb-2018

IJRET invites papers from various engineering disciplines for Volume-07 Issue-02, Feb-2018.

Submit Manuscript

Published Vol-07 Iss-01 Jan-18

IJRET Volume-07 Issue-01, Jan-2018 is published now.

Browse Papers

PLANNING AND TRACKING OF A PROJECT IN A CONSTRUCTION INDUSTRY

Vijayendra B V, Shashikumar A, G. Narayana

Abstract: Proper planning and scheduling is very essential in construction to minimize and prevents the delays of construction. considerable amount of time, resources are wasted every year in construction industry due to improper planning and scheduling. With globalization the construction works will be huge and complex planning in such cases large amount of paper work will required. Which can be reduced by the software like MS project by providing proper data to that in proper manner then it will give good result. The warning mechanism should implement in this to alert the organizing team In correct time. The main important in this study is proper plan and schedule with tracking of multy level car parking and analyze what are the present position of the work. The MS project program is being the primary supply in conducting this study. This application might be utilizing to increase a planning and scheduling model for the constructing building task. Despite the fact that the usage of this software between the constructions enterprise remains to be cut back, for that reason with the construction of those documents in the end will give the person some enter about the importance of the primavera.

Keywords: Planning, Scheduling, Tracking, Construction Management

DOI: https://doi.org/10.15623/ijret.2016.0506069

Home | Publication Ethics | Privacy Policy | Terms & Conditions | Refund Policy | Feedback | Contact Us
Copyright © 2012-2018 IJRET Journal All rights reserved