CALL FOR PAPERS :
DEC-2018
| Submission Last Date |
:
|
30-Dec-2018
|
| Acceptance Notification
|
:
|
in 15 days
|
| Publication Date
|
:
|
in 5 days
|
FOR AUTHORS
FOR REVIEWERS
IJRET® PUBLICATIONS
DOWNLOADS
CONTACT US
NEWS & UPDATES
|
PLANNING, SCHEDULING AND RESOURCE OPTIMISATION OF MULTIPLE PROJECTS USING ORACLE PRIMAVERA P6
Sushant Pradhan, Rajendra .S, Vijay.K
Abstract: The construction industry today has bloomed by leaps and bounds. Every construction industry face a stiff competition in every section of project, be it technique, equipment, methodology or management. The goals are been created and the benchmark is getting higher. Construction Industries involve themselves in numerous projects and also aim for higher turnover as financial benefit is the ground reality. The task becomes tougher when one indulges to maintain customer satisfaction i.e. quality and duration at the same time. Seldom have the companies failed to attend the promise. Hence, the solution is “better project management”. Companies in the past have faced a lot of problems especially when it comes to “multiple projects”. The data are overloaded, the cost has been overrun, the duration is extended and the resources have been over-allocated. Thus resulting in improper project management. Hence this study of mine would like to serve as a reference while managing such kind of multiple projects. There are three sites considered and the work is been done simultaneously. The software used is Oracle Primavera P6.
Keywords: Planning, Scheduling, Resource optimization, Multiple Projects, Oracle Primavera P6
DOI: https://doi.org/10.15623/ijret.2016.0506067
|
|