CALL FOR PAPERS :
DEC-2018
| Submission Last Date |
:
|
30-Dec-2018
|
| Acceptance Notification
|
:
|
in 15 days
|
| Publication Date
|
:
|
in 5 days
|
FOR AUTHORS
FOR REVIEWERS
IJRET® PUBLICATIONS
DOWNLOADS
CONTACT US
NEWS & UPDATES
|
PROCEDURE OF INSERTING RH GIRDER METHOD IN ROAD UNDER BRIDGE
Ranjeet. P, D.V.S. Narshima Rao, Md. Akram Ullah Khan
Abstract: The intersection of railway track and the road at the same level is referred to a level crossing. In the urban areas the level crossing are generally monitored by qualified railway personnel. At level crossing we use many techniques to solve the problem where road traffic and railway traffic meat at one pace. Road under bridge and road over bridge are considered as solutions for avoiding level crossings of roads and railway track. Here we use the best method to solve the problem at urban places where road and railway track intersect is RH Girder method.
Keywords: RH Girder, Girder, Level Crossing, Road Over Bridge and RUB etc…
DOI: https://doi.org/10.15623/ijret.2016.0504002
|
|