CALL FOR PAPERS :
DEC-2018
| Submission Last Date |
:
|
30-Dec-2018
|
| Acceptance Notification
|
:
|
in 15 days
|
| Publication Date
|
:
|
in 5 days
|
FOR AUTHORS
FOR REVIEWERS
IJRET® PUBLICATIONS
DOWNLOADS
CONTACT US
NEWS & UPDATES
|
PROCEDURE AND CONSTRUCTION OF ROAD UNDER BRIDGE BY BOX PUSHING METHOD
Ranjeet. P, D.V.S. Narshima Rao, Mohd Akram Ullah Khan, K. Hanumanthu
Abstract: The intersection of railway track and the road at the same level is referred to a level crossing. In the urban areas the level crossing are generally monitored by qualified railway personnel who monitor the train movement and close the level crossing gate to stop the interfering road traffic but such closing of gates leads to congestion in road traffic and also causes loss of time to road users. Road under bridge and road over bridge are considered as solutions for avoiding level crossings of roads and railway track. There are 3 main methods in construction of road under bridge. Box pushing method, Cut and cover method, Rolling technique using RH girder. In this we discuss about the implements, soil friction, effects required, capacity of jacks and there uses, skew angles and at square angles.
Keywords: Road Under Bridge, Level Crossing, Box Pushing Method and RUB etc
DOI: https://doi.org/10.15623/ijret.2016.0503078
|
|