IJRET
  • CrossRef
  • Google Scholar
  • ischolar
  • Index Copernicus
  • IJRET
  • Alternate Text
  • IJRET
  • IJRET
  • IJRET
  • Alternate Text
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
Authors will receive one hard copy of full paper, individual print certificates and digital certificates, Submit Manuscript

CALL FOR PAPERS : DEC-2018

Submission Last Date :  30-Dec-2018
Acceptance Notification :  in 15 days
Publication Date :  in 5 days
Submit Manuscript Online

FOR AUTHORS

FOR REVIEWERS

IJRET® PUBLICATIONS

DOWNLOADS

CONTACT US

NEWS & UPDATES

Call for Paper Vol-7 Iss-02 Feb-2018

IJRET invites papers from various engineering disciplines for Volume-07 Issue-02, Feb-2018.

Submit Manuscript

Published Vol-07 Iss-01 Jan-18

IJRET Volume-07 Issue-01, Jan-2018 is published now.

Browse Papers

ACTIVITY SCHEDULE AND AFFECTIVE CONTROL OF COMPONENT BASED PROJECT

P. K. Suri, Karambir

Abstract: Abstract The overall performance of any organizations depends on the way the project is managed and scheduled. The successful implementation of one or two big or complex project does not indicate that this organization will perform In the same way in future. Component based implementation of software development projects in the automotive industry have to face the rapid strategies for the use of the latest technologies that would provide the success of this type of projects, namely the frequency of change requirements during the life cycle. The cost and time for software testing was analyzed and to avoid delays in the project and more to cope with disturbances caused by changing requirements in the each phase of the project life cycle. Using of Component Based Software Engineering(CBSE) in software company, the implementation of any software project has become easy but the integration of available component or their use is the not only skill of project manager but the delivery of project in time is a required.. The project manager ensure the success of their project as a competitive advantage and establish such a system which will work with limited resources and available time. The project management tools and techniques i.e. Critical Path Methods(CPM) or Program Evaluation and Review Techniques (PERT) are used in reality as the most valuable and are planned to be used in the component based software testing system. This research result point out that there is a huge difference between planned and unplanned testing project. It also shows that the time of testing can be reduced with increase of cost of failure as a result the company may decide the benefit from that project. Analysis of the results allows to determine dependencies between level of company’s maturity level in project management, used project management tools and techniques, and values gained by the company from project management time to time with measured risk factor.

Keywords: K Component Base Software Engineering(CBSE), CPM, PERT, Project life cycle, planned or unplanned project