IJRET
  • CrossRef
  • Google Scholar
  • ischolar
  • Index Copernicus
  • IJRET
  • Alternate Text
  • IJRET
  • IJRET
  • IJRET
  • Alternate Text
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
Authors will receive one hard copy of full paper, individual print certificates and digital certificates, Submit Manuscript

CALL FOR PAPERS : DEC-2018

Submission Last Date :  30-Dec-2018
Acceptance Notification :  in 15 days
Publication Date :  in 5 days
Submit Manuscript Online

FOR AUTHORS

FOR REVIEWERS

IJRET® PUBLICATIONS

DOWNLOADS

CONTACT US

NEWS & UPDATES

Call for Paper Vol-7 Iss-02 Feb-2018

IJRET invites papers from various engineering disciplines for Volume-07 Issue-02, Feb-2018.

Submit Manuscript

Published Vol-07 Iss-01 Jan-18

IJRET Volume-07 Issue-01, Jan-2018 is published now.

Browse Papers

ASSESING THE VARIOUS PROBLEMS FACING IN ARRANGING APPROPIRATE LABOUR AND QUALITY MATERIALS FOR HIGH RISE BUILDING WORKS AND PREPARING REMEDIAL MEASURES AND A FLOW-CHART FOR ADOPTION

Aravindan B, Arunima Jayakumar

Abstract: A big major, continental concern in construction industry is arranging the labour and quality materials accordingly. The organizations which don’t recognize the upcoming problems due to mismanagement of labour and material works have justifiably been forced out of the mainstream of construction activity. A good project management is needed to drastically reduce the problems facing in labour and material works, which intern increases the chances of success. This paper concentrates on assessing the various problems facing in arranging appropriate labour and quality materials for high rise building works. The objective of the project is to study and analyze the various factors that affect labour and material works and to provide an effective flowchart with remedial measures which helps to reduce the problems arising from labour and quality material works in the construction industry. A set of questionnaires about labour and quality material works has been prepared, categorized into 7 sections and then distributed it to various companies and then analyzed. The analyzed and ranked data has been used to prepare remedial measures and a flowchart for adoption in construction industry.

Keywords: Labour, Quality Materials, Material Management and construction etc…

DOI: https://doi.org/10.15623/ijret.2015.0403047

Home | Publication Ethics | Privacy Policy | Terms & Conditions | Refund Policy | Feedback | Contact Us
Copyright © 2012-2018 IJRET Journal All rights reserved