IJRET
  • CrossRef
  • Google Scholar
  • ischolar
  • Index Copernicus
  • IJRET
  • Alternate Text
  • IJRET
  • IJRET
  • IJRET
  • Alternate Text
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
Authors will receive one hard copy of full paper, individual print certificates and digital certificates, Submit Manuscript

CALL FOR PAPERS : DEC-2018

Submission Last Date :  30-Dec-2018
Acceptance Notification :  in 15 days
Publication Date :  in 5 days
Submit Manuscript Online

FOR AUTHORS

FOR REVIEWERS

IJRET® PUBLICATIONS

DOWNLOADS

CONTACT US

NEWS & UPDATES

Call for Paper Vol-7 Iss-02 Feb-2018

IJRET invites papers from various engineering disciplines for Volume-07 Issue-02, Feb-2018.

Submit Manuscript

Published Vol-07 Iss-01 Jan-18

IJRET Volume-07 Issue-01, Jan-2018 is published now.

Browse Papers

REAL TIME RESERVOIR OPERATION (VALIDATION PHASE) A CASE STUDY

Falguni Baliarsingh

Abstract: The LP formulation with the selected set of penalties is run in the validation phase. There are two sub-phases in the validation phase. In the first sub-phase, three years corresponding to the flood, normal, and drought years are considered. The performance of these years is measured by the reservoir storage at the end of monsoon season and peak flow at d/s flood control point. In the second sub-phase, eight extreme floods from the history of the reservoir are chosen. The performances of these floods are measured by peak flow at d/s flood control point during each of the floods. The real time operation is done for three time intervals, viz. 24, 12 and 6 hours.

Keywords: Real time reservoir operation, validation phase

DOI: https://doi.org/10.15623/ijret.2014.0309072

Home | Publication Ethics | Privacy Policy | Terms & Conditions | Refund Policy | Feedback | Contact Us
Copyright © 2012-2018 IJRET Journal All rights reserved