IJRET
  • CrossRef
  • Google Scholar
  • ischolar
  • Index Copernicus
  • IJRET
  • Alternate Text
  • IJRET
  • IJRET
  • IJRET
  • Alternate Text
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
  • IJRET
Authors will receive one hard copy of full paper, individual print certificates and digital certificates, Submit Manuscript

CALL FOR PAPERS : DEC-2018

Submission Last Date :  30-Dec-2018
Acceptance Notification :  in 15 days
Publication Date :  in 5 days
Submit Manuscript Online

FOR AUTHORS

FOR REVIEWERS

IJRET® PUBLICATIONS

DOWNLOADS

CONTACT US

NEWS & UPDATES

Call for Paper Vol-7 Iss-02 Feb-2018

IJRET invites papers from various engineering disciplines for Volume-07 Issue-02, Feb-2018.

Submit Manuscript

Published Vol-07 Iss-01 Jan-18

IJRET Volume-07 Issue-01, Jan-2018 is published now.

Browse Papers

PERFORMANCE EVALUATION OF COLD RECYCLING EXPERIMENTAL STRETCH CONSTRUCTED WITH RBI-GRADE-81 AT BANGALORE UNIVERSITY

Ayyanna Habal, Kavya P, Amarnath M S

Abstract: The bituminous pavement rehabilitation alternatives are mainly overlaying, recycling and reconstruction. In the recycling process the material from deteriorated pavement, known as reclaimed asphalt pavement (RAP), is partially or fully reused and it is a valuable approach for technical, economical, and environmental reasons. Full Depth Reclamation (FDR) is one of the cold methods of recycling the bituminous pavements. In this study an experimental stretch is selected for FDR in which the full flexible pavement section and a predetermined portion of the underlying materials are milled and remixed with about 10 % of 10 mm down size aggregate and 30 % stone dust to match the Bituminous Concrete (BC) Grade-I mix limits and known quantity of RBI 81 stabilizer. Stabilization of RAP material with RBI grade 81 reduces the requirement of new materials, time of construction and increases the strength of the road. This report consist of a case study of road constructed at Jnanabharathi campus, Banglore University, which include assessment of existing pavement condition and the preparation of pavement surface for the construction of stabilized layer and construction aspects of pavement using RAP material stabilized with RBI grade 81. The report also presents results of some short term functional and structural condition studies on the study stretch. From the limited studies carried out it is concluded the RAP material can be used effectively by the stabilization with RBI grade 81. From the field studies it is concluded that the strength of the pavement increases with increase in RBI grade 81 dosages

Keywords: Stabilization of Reclaimed Asphalt Pavement (RAP), RBI Grade 81, Full Depth Reclamation, Cold in Place Recycling (CIR)

DOI: https://doi.org/10.15623/ijret.2013.0213031

Home | Publication Ethics | Privacy Policy | Terms & Conditions | Refund Policy | Feedback | Contact Us
Copyright © 2012-2018 IJRET Journal All rights reserved