CALL FOR PAPERS :
DEC-2018
| Submission Last Date |
:
|
30-Dec-2018
|
| Acceptance Notification
|
:
|
in 15 days
|
| Publication Date
|
:
|
in 5 days
|
FOR AUTHORS
FOR REVIEWERS
IJRET® PUBLICATIONS
DOWNLOADS
CONTACT US
NEWS & UPDATES
|
OPTIMIZATION OF PRODUCTIVITY WITH SURFACE MINER USING CONVEYOR LOADING AND TRUCK DISPATCH SYSTEM
S. K. Palei, N.C. Karmakar, P. Paliwal, B. Schimm
Abstract: This paper aims at optimizing the productivity at the surface miner’s face with conveyor loading and dump-truck dispatch system to minimize the down times of surface miner as well as trucks. The surface miner was working in opencut method in a limestone mine located in the Southern part of India. Time study was carried out during three working shifts (each of eight-hour duration) for productivity analysis. A model has been developed and simulated in MATLAB for the productivity of surface miner considering the impact of two major parameters – number of trucks and available face length. The number of trucks for optimum production was found to be five. However, the 5% and 95% confidence interval for the number of trucks was 2.3 and 7.4 respectively for the case study face. It was also observed that the face of 330 m length was sufficient for the surface miner to work efficiently.
Keywords: Opencast mine, Surface miner, Mining machinery, Truck dispatch system, Productivity analysis
DOI: https://doi.org/10.15623/ijret.2013.0209059
|
|